Hani Gabr Hosni El Nefari

Electrical & Electronics Engineer

About Candidate

Educational Background:
Degree : Bachelor of Electrical Engineering (Power and Control).
University : Mansoura University.
Faculty : Faculty of Engineering.
Major : Electrical Power and Control.
Graduation Year : May 2008-Very Good
Graduation Project : Proposed Adaptive Time Delay O.C Relay & Simulation by PSCAD.
Project Grade : Excellent

Profile/Objective :
Electrical Senior Project Engineer/Project Manager with a solid site & project management experience
having more than 13 years of experience in handling site activities involving erection, testing, and
commissioning of 132, 220, 380, 500 kV GIS Turnkey Substations, 66/22 KV AIS Substations with highQuality QC/QA, Procurement Background, Power Plant (Gas &Thermal & Combined Cycle and PV Solar
Plants) and BESS (Battery Energy Storage System) inside Egypt state and overseas (GCC Area, Africa).
Owning a strong civil basic background. Having 1 Year of Experience in Sales and Business Development
(Stakeholders Relationships) Contract claim management & warranty claims and Risk Management plans
Executed a wide-scale PV Solar plants up to 100 MW and BESS with a scale of 5 MW PV Solar.
Have good communication and interpersonal skills with the required flexibility to handle difficulty
Seeking a challenge in a big organization where my educational background & experience (Area of
Expertise) can be applied and further developed.

Position: Project Site Manager/Technical Manager.

State: Egypt (From May.2019 till Now)

Employer: Alexandria for Engineering Works, Ltd. Client: EETC/EEHC

Project: EPC of turnkey E.HV Substations till 500 KV.

Position: Project Site Manager.

State: Tunis (From April.2019 to April .2020)

Employer: METKA-EGN. Client: Eni –B.V Tunisia

Project: ADAM 5.5 MWp PV Solar Plant (BESS) – Off-Grid System (Hybrid Plant)

Position: Construction Manager. Egypt (From August.2018 till April.2019)

Employer: Larsen & Toubro Construction Transmission and Distribution.

Client: Egyptian Electricity Transmission Company “EETC”

Project: EPC-Turn Key project (500/220 KV GIS Substations).

 

Location